upepo
Elder Lister
Statement from KeNHA
KeNHA has adopted Hand Packed Stone (HPS) technology in the construction of Mombasa Road to create a durable sub-base and extend the pavement's lifespan. This labour-intensive method enhances the road’s structural integrity, ensuring taxpayers get value for money.
To address drainage challenges caused by high water percolation, the contractor has also introduced a rockfill base to stabilise the wet ground. The road’s surface will feature a layer of Dense Bitumen Macadam and Asphalt Concrete for added strength and durability.
KeNHA has adopted Hand Packed Stone (HPS) technology in the construction of Mombasa Road to create a durable sub-base and extend the pavement's lifespan. This labour-intensive method enhances the road’s structural integrity, ensuring taxpayers get value for money.
To address drainage challenges caused by high water percolation, the contractor has also introduced a rockfill base to stabilise the wet ground. The road’s surface will feature a layer of Dense Bitumen Macadam and Asphalt Concrete for added strength and durability.