From this article here :


It will cost the government :

The Sh62 billion project, which was started late last year, is expected to revolutionalise transport in Nairobi and ease traffic jams on Mombasa Road by providing faster, reliable, and less costly transport.

But the revenue will be :

The Expressway is expected to serve at least 25,000 vehicles per day with a user expected to pay Sh600 per day to use the road.

So let's do math
In one day it will generate a revenue of :
600x25,000=15,000,000
So in one year =364X15,000,000=5.5b
It will take 62b÷5.5 = 12 years to recoup the cost of construction.


So swali i would like to ask elite of akina @Okiya na @Mwalimu-G? Now that the 12 years have lapsed and they have gotten back their money how long will they continue to collecting the money from us off in the name recouping their money
 

shocks

Elder Lister
From this article here :


It will cost the government :

The Sh62 billion project, which was started late last year, is expected to revolutionalise transport in Nairobi and ease traffic jams on Mombasa Road by providing faster, reliable, and less costly transport.

But the revenue will be :

The Expressway is expected to serve at least 25,000 vehicles per day with a user expected to pay Sh600 per day to use the road.

So let's do math
In one day it will generate a revenue of :
600x25,000=15,000,000
So in one year =364X15,000,000=5.5b
It will take 62b÷5.5 = 12 years to recoup the cost of construction.


So swali i would like to ask elite of akina @Okiya na @Mwalimu-G? Now that the 12 years have lapsed and they have gotten back their money how long will they continue to collecting the money from us off in the name recouping their money
:sneaky::sneaky::sneaky::sneaky::sneaky::sneaky: There is maintanance my friend. Huyo mnyama mtamlipia sana
 
Last edited:

Kasaman

Elder Lister
The contractor has take the empty land at vetlab opposite Kabete police station.
The fly over will take less time ,he need pillars and pre casts but relocating power lines will need over 1.2 billion. Kwaza ile underground cable kutoka parkland through museum hill to holy Basilica si mchezo ! Plus the numbers of transformers along the highway
 
Last edited:

QuadroK4000

Elder Lister
The contractor has take the empty land at vetlab opposite Kabete police station.
The fly over will take less time ,he need pillars and pre casts but relocating power lines will need over 1.2 billion. Kwaza ile underground cable kutoka parkland through museum hill to holy Basilica si mchezo ! Plus the numbers of transformers along the highway
Kuna majamaa watakafunga.

Kwanza hiyo cable management...
 

shocks

Elder Lister
The contractor has take the empty land at vetlab opposite Kabete police station.
The fly over will take less time ,he need pillars and pre casts but relocating power lines will need over 1.2 billion. Kwaza ile underground cable kutoka parkland through museum hill to holy Basilica si mchezo ! Plus the numbers of transformers along the highway
ako na kambi mbili,ingine iko near carnivore but access on sourthern bypass
Kazi ya moving other lines ni kubwa, mombasa road wameanza kusongesha sewer lines
 