Google maps street view has very many gaps, that road na ile nimetumia hazikoNilikuwa rũracio huko October '20 na hizo berabara nyingi ni rough, with those bridge you have to Ford in the rainy season. Try Google Maps.
Siakago-Embu was poorly done, has many deep potholes, and the crazy miraa proboxes zig zag very dangerouslySiakago-Kiritiri is under construction, tho hio technology ya low volume seal road won't last
Hiyo Low volume seal is applied in many of the reclassified C class roads, but sadly less than a year after construction pot holes develop, although it has assisted in construction of more tarmacked roads in areas where they're seeing tarmac for the first time.Thank you all, nilipitia Ugweri-Siakago-Kiritiri-Kanyonyoo-Thika. Jam ya Thika town ndio inaangusha hio route, otherwise 120 ndio speed from Kiritiri to Kilimambogo. Siakago-Kiritiri is under construction, tho hio technology ya low volume seal road won't last.
Google maps street view has very many gaps, that road na ile nimetumia haziko
Its not paved, hope your tires are good.Is this highway paved?
Niko upande wa Embu thinking of using it on my way back.
Hiyo Low volume seal is applied in many of the reclassified C class roads, but sadly less than a year after construction pot holes develop, although it has assisted in construction of more tarmacked roads in areas where they're seeing tarmac for the first time.
The proposed bypass from Gatua Nyaga to kangundo road is overdue itapunguzia watu safari.
Nipo Kiongozi, Niko poa kabisa, you speak Kipsigis dialect?Illioo kiongos?
Imi gomnyies?
Used a different route, we await its pavingIts not paved, hope your tires are good.
Nipo Kiongozi, Niko poa kabisa, you speak Kipsigis dialect?