Imekunywa maji2 billions? Two billion inaishaje hapo?
ungefanya hiyo kazi na pesa ngapi?2 billions? Two billion inaishaje hapo?
very true... na zile man hours wasted everydayIt is shameful that such a simple solution had to take decades and hundreds of lives before implementation.
Kama thika road with the costs of acquiring land of which they did not in this project costed 32b for 50kms, if you do the math, this should have been a maximum cost of 1Bungefanya hiyo kazi na pesa ngapi?
You can't make such a comparison...thika road is not a floating bridge....try and find out the costKama thika road with the costs of acquiring land of which they did not in this project costed 32b for 50kms, if you do the math, this should have been a maximum cost of 1B
Na outer ring? Si hio ni bridge pia?You can't make such a comparison...thika road is not a floating bridge....try and find out the cost
magari bado ziko...Kazi ya ferry imeisha ivo tu after Christmas
Pia hii sio ndongo.... its 637m including the approachs on both sides and its also supposed to have a 150m long movable section in the middle...Kigamboni bridge ya Tz costed 136million $ and it's the best in East Africa na ukumbuke iko na 6 lanes and stretches as far as 680m
unataka kusema imezama yaani imeogelea...Imekunywa maji
We as engineer we have to be added more 2 months to accomplish the task. So by Christmas hatutakuwa tumemalizaThe SH1.9b Likoni floating bridge 92pc complete, CS Macharia says to be commissioned by President Kenyatta before Christmas
View attachment 26581View attachment 26582