Biggest heist is the Wang'uru stadium. Ati it consumed over 6B and it's not even complete with substandard finishes and an asphalt track. I know of a stadium in Nairobi that has used slightly over 900m so far and has kasarani standard athletics track, an Olympic size swimmo, sprinklers that rise and disappear from the ground and also a gender sensitive fully equipped underground gym. Total budget 1.2B when fully done. The Mwea one should have cost 400m maximum.
 

Mwalimu-G

Elder Lister
Biggest heist is the Wang'uru stadium. Ati it consumed over 6B and it's not even complete
I don't seem to find any resource backing this figure...

AllAfrica

Kenya: Building of Sh300 Million Wang'uru Stadium in Kirinyaga Starts


31 AUGUST 2020
The Nation (Nairobi)
By George Munene
The government has started building a Sh300 million stadium in Kirinyaga County following a presidential directive.
A spot check by the Nation on Monday established that Veevee Enterprises which won the tender has started work on Wang'uru Stadium whose condition had deteriorated to worrying levels.
The project involves the building of a standard pitch, race track, terraces, recreation facilities, perimeter wall, dressing rooms and ablution blocks among other amenities.
It will take six months to complete the mega project located in the sprawling Mwea plains.

.

The Government of Kenya, through the Ministry of Sports Culture & Heritage of Kenya (Sports Kenya), has begun construction of the nearly USD 2.8 million Wang'uru Stadium in Mwea, Kirinyaga County.
 

Budspencer

Elder Lister
I don't seem to find any resource backing this figure...

AllAfrica

Kenya: Building of Sh300 Million Wang'uru Stadium in Kirinyaga Starts


31 AUGUST 2020
The Nation (Nairobi)
By George Munene
The government has started building a Sh300 million stadium in Kirinyaga County following a presidential directive.
A spot check by the Nation on Monday established that Veevee Enterprises which won the tender has started work on Wang'uru Stadium whose condition had deteriorated to worrying levels.
The project involves the building of a standard pitch, race track, terraces, recreation facilities, perimeter wall, dressing rooms and ablution blocks among other amenities.
It will take six months to complete the mega project located in the sprawling Mwea plains.

.

The Government of Kenya, through the Ministry of Sports Culture & Heritage of Kenya (Sports Kenya), has begun construction of the nearly USD 2.8 million Wang'uru Stadium in Mwea, Kirinyaga County.
31 August 2020? Niulize vizuri boss. It's not even ready yet sahii despite hosting Mashujaa day.
 