Idiot engineering

Mwotofaya

Lister
Alafu ni chinaman design sio Kenyan contractor
Those walkway's and all shoddy poorly designed lower road works were subcontracted to a Kenyan connected contractor,
do you think China road and bridge corp would make such blasphemous design mistakes which require basic common sense let alone engineering sense.
 

upepo

Elder Lister
Those walkway's and all shoddy poorly designed lower road works were subcontracted to a Kenyan connected contractor,
do you think China road and bridge corp would make such blasphemous design mistakes which require basic common sense let alone engineering sense.
These are temporary works as they wait to redo the ground floor.
 

zapp_brannigan

I am not a Futurama fan .
Those walkway's and all shoddy poorly designed lower road works were subcontracted to a Kenyan connected contractor,
do you think China road and bridge corp would make such blasphemous design mistakes which require basic common sense let alone engineering sense.
Subcontracted..maybe .But the subcontracted party works under the China man so if the china man approved to the works then he is equally shoddy . And overall KeNHA approved all this shoddy work .Hapa the blame is KeNHA .
 
Top