Exactly,the word build is not the right word to use, the headline should have read "This 10-story apartment building was assembled in just over a day" otherwise it took longer than that designing and constructing the actual prefabs.
That is how people get disappointed
That thing can be done here, and I doubt fabricating things then transporting them to Kenya would make economic sense, otherwise contractor wa express way angefanya the precast beams in ChinaWhat if Uhuru gets serious and contacts this company to build 50 such houses in Nairobi? Let them do their assembly in China and transport the assembled materials to Kenya if some of the materials can't be found here.
Whatever makes economic sense should be implemented man . I'm sure if some technocrats can sit down and work on modalities of this then something feasible can be done.That thing can be done here, and I doubt fabricating things then transporting them to Kenya would make economic sense, otherwise contractor wa express way angefanya the precast beams in China